Construction Work up to 2007
|
|
|

prior to the move1930 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

getting to grips with the Campbell1962 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

crank case being lifted off1571 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

crank case being removed on the Campbell1482 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

Mirrlees engine needs to be moved to allow access to the Campbell1524 views
|
|

lifting the crank shaft out1465 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

pieces of the giant Campbell waiting to be moved1479 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

stripped and waiting to be moved1456 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

Crane at work on the Campbell1512 viewsBehind the generator house you can see the crane manoevering parts of the Campbell into place outside the museum fence.
|
|

Left a bit1500 views
|
|

Preparing the foundations1800 views
|
|

Campbell Engine being reassembled outside museum entrance1550 viewsThe flywheel being lowered into place.
|
|
|